| Learn more |
| TEL:+86-10-63591520 |
| TEL:+86-10-63591500 |
| Email: |
| webmaster@cptdc.cnpc.com.cn |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Offshore Equipment |  | | | Introduction | | CPTDC Offshore Engineering Branch mainly engages in the sales of offshore engineering equipment of CNPC. Cooperating with the manufacturers... | | view details |
| | |
 | | | Floating Production Storage and Offloading (FPSO) | | A Production Capacity From 30,000 Barrels To 250,000 Barrels Per Day A Storage Capacity From 200,000 Barrels To 2,000,000 BarrelsOperating From 30m To 2000m in water | | view details |
| | |
 | | | Liquefied Natural Gas(LNG) Carrier | | Liquefied Natural Gas(LNG) Carrier 147,000m3 -220,000m3 Membrane Type Membrane Made Of The Material Invar... | | view details |
| | |
 | | | Very Large Crude Carrier (VLCC) | | Very Large Crude Carrier (VLCC)160,000DWT – 319,999 DWT Unlimited Navigation AreaSingle Oar And Rudder ... | | view details |
| | |
 | | | Semi-Submersible Rig | | Semi-submersible Working Depth From 750m To 3000mDrilling Depth from 7500m To 10000mDynamic Positioning: DP2,DP3 ... | | view details |
| | |
 | | | Drillship | | DrillshipWorking Depth from 500m to 3000mDrilling Depth from 5000m to 10000mDynamic Positioning: DP3Six (6) Thrusters ... | | view details |
| | |
 | | | Jack-Up | | Jack-up Truss LegsWorking Depth From 91.44m To 122mDrilling Depth From 7000m To 9000mCantilever Outreach From 15.24m To 23m ... | | view details |
| | |
 | | | Submersible Rig | | ubmersibleWorking Depth 10m Drilling Depth 7000mCantilever Outreach 10m ... | | view details |
| | |
 | | | Multi-purpose Offshore Support Vessels (OSVs) | | Anchor Handling Offshore Supply Vessel (AHTS)4000Hp To 12000Hp Dynamic Positioning:DP1,DP2,DP3 ... | | view details |
| | |
 | | | Jacket | | Working Depth From 20m To 200m Drilling Depth From 3000m To 7000m ... | | view details |
| | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|